Wittur SPA supplied a modernization package for two passenger elevators for Opéra Garnier in the Palais Garnier in Paris.
The first elevator system was modernized in April, and the second in June-July. The lifts have a rated load of 2000 kg and are capable of speeds up to 1.6 mps. The two cars also feature Hydra glassframed doors with a special silkscreen printing design in the lower part to give optical continuity to the nearby iron balustrade.
Downloads
请注意,这只是所有可用文件的一个选择。您可以从服务 > 文件搜索和下载页面访问所有文件,从服务 > 证书搜索页面访问所有证书。
Available documents 1 files
Filters Type: MI 语言: |
||
ElevatorWorld November 2010 | Download |