Wittur SPA supplied a modernization package for two passenger elevators for Opéra Garnier in the Palais Garnier in Paris.
The first elevator system was modernized in April, and the second in June-July. The lifts have a rated load of 2000 kg and are capable of speeds up to 1.6 mps. The two cars also feature Hydra glassframed doors with a special silkscreen printing design in the lower part to give optical continuity to the nearby iron balustrade.
Downloads
Dit is slechts een selectie van alle beschikbare documenten. U hebt toegang tot alle documenten via de pagina DIENSTEN > DOCUMENTEN ZOEKEN EN DOWNLOADEN en tot alle certificaten via de pagina DIENSTEN > CERTIFICATEN ZOEKEN.
Available documents 1 files
Filters Type: MI Taal: |
||
ElevatorWorld November 2010 | Download |