Wittur SPA supplied a modernization package for two passenger elevators for Opéra Garnier in the Palais Garnier in Paris.
The first elevator system was modernized in April, and the second in June-July. The lifts have a rated load of 2000 kg and are capable of speeds up to 1.6 mps. The two cars also feature Hydra glassframed doors with a special silkscreen printing design in the lower part to give optical continuity to the nearby iron balustrade.
Downloads
Bunun yalnızca mevcut tüm belgelerin bir seçimi olduğunu lütfen unutmayın. Tüm belgelere HİZMETLER > DOKÜMAN ARA VE & İNDİR sayfasından ve tüm sertifikalara HİZMETLER> SERTİFİKALAR ARA sayfasından erişebilirsiniz.
Available documents 1 files
Filters Type: MI Dil: |
||
ElevatorWorld November 2010 | Download |